The
design of a roadway involves several stages of detailed engineering
and technical review and interim levels of approval. Project
information is shared and discussed with the public at project
milestones, and public input is considered in the evaluation
of alternatives. The final design of the roadway is represented
in plans and specifications that construction contractors
use to prepare construction bids.
Current Design Project:
Loop 202 (Red Mountain Freeway) Loop 101 to Gilbert
Road HOV Lane Final Design
As part of the Regional Transportation Plan, the Arizona Department
of Transportation is in Final Design for the addition of High
Occupancy Vehicle (HOV) lanes and Freeway Management Systems
(FMS) in the center of Loop 202 between Loop 101 and Gilbert
Road. The existing cable barriers will be replaced with concrete
barriers.
Anticipated
Schedule –
- Final
design kicked off in January 2008
- Final
design anticipated to last 9 to 12 months
|
 |
Our Valley Freeway System is part of the 2004 voter-approved Regional Transportation Plan. We are working hard with our transit partners to implement the voters’ vision and are committed to quality, safety, open communication with our neighbors, and minimal inconvenience to the traveling public. |
|
|
|