I-8, California State Line-Ligurta (MP 0-19)
|
|
|
Project No.:
|
IM-008-A(202) / H774701C
|
|
|
Location:
|
Interstate 8 from Milepost 0 - MP 19
|
|
|
Contractor:
|
ABBCO Sign Group, Inc.
|
|
|
Project Cost:
|
$998,893.00
|
|
|
Scope:
|
Removing and replacing signs along the interstate with new ones.
|
|
|
Duration:
|
Nearly completed. |
|
|
I-8, Ligurta to Dateland (MP 19-66) |
| |
Project No.: |
H773901C |
| |
Location: |
Interstate 8 from Milepost 19-66 |
| |
Contractor: |
ABBCO Sign Group, Inc. |
| |
Project Cost: |
$906,775.00 |
| |
Scope: |
Removing and replacing signs along the interstate with new ones. |
| |
Duration: |
January 2012- Spring 2012 |
| |
|
I-8, State Line to Fortuna Road (MP 0.56-13.7)
|
|
|
Project No.:
|
008-A-(206)A / H779301C
|
|
|
Location:
|
Interstate 8 from Milepost 0.56 - MP 13.7
|
|
|
Contractor:
|
Meadow Valley Contractors, Inc.
|
|
|
Programmed Cost:
|
$10,994,201.00 |
|
|
Scope:
|
The work consists of milling the existing pavement and replacing it with new AC pavement and a 1/2" of AR-ACFC. Additional work includes pavement markings, guard rail, minor drainage improvements, and other related items.
|
|
|
Duration:
|
February 2011 to 2012 |
|
|
I-10 Dike Repairs |
| |
Project No.: |
H808201C |
| |
Location: |
Interstate 10 (MP 47-48) approximately two miles east of Vicksburg Rd. traffic interchange. |
| |
Contractor: |
Southwest Concrete Paving Co. |
| |
Project Cost: |
$256,413.44 |
| |
Scope: |
The project consists of repairing dike materials, removing and replacing fence, erosion control and other related items. |
| |
Duration: |
January 2012- Spring 2012 |
| |
|
I-10 MP 52 to 63 Bouse Wash Rest Area to Gas Line Road
|
|
|
Project No.:
|
H751101C |
|
|
Location:
|
I-10 from mile post 52 to mile post 63
|
|
|
Contractor:
|
Meadow Valley Contractors, Inc.
|
|
|
Project Cost:
|
$6,734,226.00
|
|
|
Scope:
|
The proposed work consists of removing the existing pavement and replacing it with a rubberized asphaltic concrete friction course. In addition, a portion of I-10 will be rehabilitated with a hot blend of an emulsified rejuvenating agent and recycled material. The project also consists of replacing guardrail, replacing existing pavement markers, removing vegetation and other miscellaneous work. |
|
|
Duration:
|
Approximately 8 months beginning September 2011 |
|
|
Oxbow Bridge Repairs |
| |
Project No.: |
SB41801C |
| |
Location: |
In La Paz County along the Colorado River |
| |
Contractor: |
Lawrence Construction |
| |
Project Cost: |
$979,712.42 |
| |
Scope: |
The project consists of removing and replacing wooden bridge deck |
| |
Duration: |
September 2011- February 2012 |
| |
|
SR 85 @ Gila Bend Phase I
|
|
|
Project No.:
|
HSIP-TEA-085-B(203)N/H640701C
|
|
|
Location:
|
State Route 85 & Business 8 in Gila Bend
|
|
|
Contractor:
|
Haydon Building Corp.
|
|
|
Project Cost:
|
$13,473,722.00
|
|
|
Scope:
|
Project will improve safety and enhance State Route 85 (Pima St.) in Gila Bend. The project includes construction of a new, elevated intersection at State Route 85 (Pima St.) and Business Route 8 (B-8), a wider bridge over the Union Pacific Railroad, and realigning both State Route 85 (Pima St.) and Maricopa Road.
|
|
|
Duration:
|
Fall 2011 - Spring 2013 |
|
|
SR 95 at Bill Williams River National Wildlife Refuge Road (MP 160) |
| |
Project No.: |
H779401C |
| |
Location: |
SR 95 south of Lake Havasu |
| |
Contractor: |
Fann Contracting, Inc. |
| |
Project Cost: |
$2,386,729.54 |
| |
Scope: |
The work consists of adding a two-way left turn lane, shifting the intersection north to allow access for U.S. Fish and Wildlife Service and CAP pumping plant. Work also includes drainage improvements, new pavement markings, signage and guardrail work. |
| |
Duration: |
January 2012- July 2012 |
| |
|
SR 95, Holiday Harbour
|
|
|
Project No.:
|
NH-095-C(202)A/H638001C
|
|
|
Location:
|
State Route 95 from Milepost 156.8 - MP 157.6
|
|
|
Contractor:
|
Combs Construction Company, Inc.
|
|
|
Project Cost:
|
$1,914,913.00
|
|
|
Scope:
|
The project consists of widening an existing two-lane highway to provide a continuous two-way left turn lane along with drainage improvements. Roadway includes new AC Pavement, milling and overlaying existing AC pavement, embankment erosion protection, drainage improvements, signing and marking and other related work.
|
|
|
Duration:
|
Nearly completed.
|
|
|
See Also:
|
|
|
|
|
SR 195 I-8 to US 95 - Design Concept Report
|
|
|
Project No.:
|
195 YU 27 H7043 01L
|
|
|
Location:
|
State Route (SR) 195 between Interstate 8 and US 95 in Yuma
|
|
|
Contractor:
|
The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
|
|
|
Scope:
|
Engineering and environmental studies have been initiated to determine what improvements would be needed.
|
|
|
Duration:
|
Finalize study and environmental documents; FHWA approval.
Completion delayed; schedule to be determined. |
|
|
|
|
|
US 95 Milepost 42 to Milepost 66 - Design Concept Report
|
|
|
Project No.:
|
095 YU 42 H7022 01L
|
|
|
Location:
|
US 95 between approximate MP 42 and MP 66, located on the U.S. Army Yuma Proving Ground (YPG) in Yuma and La Paz Counties, Arizona.
|
|
|
Contractor:
|
The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
|
|
|
Project Cost:
|
|
|
|
Scope:
|
An engineering and environmental study is being completed to determine what improvements are needed for the future operation of US 95 between approximate MP 42 and MP 66.
|
|
|
Duration:
|
|
|
|
|
|
US 95 Pavement Preservation (MP 54-63 |
| |
Project No.: |
H751001C |
| |
Location: |
US 95 at Castle Dome Rd. north of Yuma |
| |
Contractor: |
Fisher Sand and Gravel |
| |
Project Cost: |
$3,034,425.00 |
| |
Scope: |
Project consists of overlaying the pavement with new pavement. |
| |
Duration: |
January 2012- April 2012 |
| |
| |